PDF: PTI DC80.1-02: Controlled Demolition of an Unbonded Post-Tensioned Concrete Slab

This report describes the controlled demolition of 100,000 square feet of post-tensioned slab, which was necessitated by suspicion of damage due to fire. The saw-cutting procedure was used to neutralize over 900 post-tensioned tendons. The report illustrates that, if required, slabs constructed with unbonded post-tensioned tendons can safely and readily be dismantled. The report concludes with recommendations for demolition of similar projects.

NOTE: This PDF will not be immediately available for download. You will receive an e-mail once your order is processed and you will have 24 hours to download the document.

The electronic version of this file is 34.1 MB in size.
Downloading this file with a dial-up modem connection is not recommended.


Price: $ 11.00